| -
Buna repair and reconstruction in the tourist centre "Pal'mida" |
| -
Berth ¹ 4 major repair in port Feodosia |
| -
Underwater part of the berth ¹ 219 repair in SevSeaFishPort |
| -
Underwater part of the berth ¹ 212 repair in SevSeaFishPort |
| -
Sewerage repair in sanatorium "Mriya " |
| - Berth building, bunas repair in boarding house Terletskiy, Phoros |
| -
Fish protection structure on the water scoop of swimming pool making and installation, SC " Dyul'ber " |
| -
Major repair of the berth pile base in Karadag National Reserve , N À S Ukraine |
| - Bunas repair in the tourist centre " Artemida " |
| - East mole washing s elimination by concrete in the bags laying in SevSeaFishPort |
| - Fish protection structure installation in Fish cannery of SevSeaFishPort |
| - Sewage header repair in Genichensk |
| - Engineering survey and certification of hydroengineering constructions in SevSeaFishPort, SevSeaTradePort,
Yevpatoriyskiy SeaTradePort, Kerchinskiy SeaTradePort, Yacht-club , Chersones museum etc . |
| - Finishing of the work at East mole building in SevSeaFishPort |
| - Cap building, and fish protection structure on water scoop of foam fire-fighting station of "Yugtorsan" making and installation |
| - Pile foundation of cordon beam transfer ramp of 49 berth SevSeaTradePort repair |
| - "Hydrowall" in the Complex "Laguna" (Gurzuf) building |